80% Faster Takeoffs for Major Highway Contractor
Back to Catalog
InfrastructureTop-10 US Highway Contractor

80% Faster Takeoffs for Major Highway Contractor

80%
Time Reduction
-92%
Error Rate
+45%
Bids/Month
$180K+
Annual Savings

Executive Perspective

"EDApro gave us a competitive edge in the highway space. We can now respond to RFPs in days instead of weeks, and our bid accuracy is phenomenal."

Robert Chen

VP of Estimating

Technical Case Study

Download the full detailed report including technical methodologies and ROI data.

Technologies Used

InfrastructureProcore IntegrationLarge Scale

The Challenge

Manual BOQ generation from complex highway design drawings took 4-5 days per project, creating bottlenecks in the bidding process and frequently missing design details.

The Solution

Implemented EDApro BOQ Generator for automated CAD analysis. Integrated with existing Procore workflow and trained estimation team on AI-assisted output verification.

Impact Breakdown

80%
Time Reduction

BOQ generation now takes 4-6 hours

-92%
Error Rate

Design detail misses dropped from 8% to <1%

+45%
Bids/Month

Capacity increased from 6 to 9 competitive bids

$180K+
Annual Savings

Labor hours saved on estimation

Final Result

By implementing EDApro, Top-10 US Highway Contractor has significantly improved their competitive posture in the Infrastructure market. The elimination of manual counting and scale-check errors ensures every bid is technically sound and highly accurate.

Want results like these?

Schedule a walkthrough of our BOQ automation engine today.

Calculate Your ROI